Call us now +36 70 442 3014 or write an email klaudia.dudla@felfoldi.hu
The all-cost of the project reached 133.408.000 forints, so the amount of the support is that of 40%. The construction of the workshop started on 21st June, 2010 and ended at the end of the 2010 year. Thanks tot he support, 12 new jobs came into existance at the Debrecen based Felföldi Confectionary Ltd., the workplace’s serve, the storage of the commodity and other materials’ in a safe and hygienic way. The optimal logistical system’s performance increases the productional and operating system’s qualitative level.